Business is booming.

FG Approves N3.4bn for Rehabilitation of Power Supply in Borno

The federal executive council (FEC) has approved the sum of N3.4 billion for the rehabilitation of power supply in Borno.

The Minister of power, Abubakar Aliyu, disclosed this on Wednesday in Borno to journalists after the council’s meeting.

The minister said the council approved a memorandum for the provision of an alternative power supply line to Maiduguri, Borno state capital.

He reiterated that the region had been disconnected from the national grid for 24 months due to insurgency.

“As you are aware, Maiduguri got disconnected from the national grid due to the activities of insurgents. They have been disconnected for over 24 months,” he said.

“About nine months ago or thereabout, we were able to supply Maiduguri through an old line which we resuscitated through the effort of the Borno state government’s rural electrification agency and the Transmission Company of Nigeria.

“They resuscitated a single line of 33 KV from Damaturu, Yobe state and through that, we took a very small quantity of electricity which could only give electricity on the 11 KV line.

“So, we are now trying to supply through another new line, a double circuit 33 KV which can take up to around 40 Megawatts from the Damaturu 330 substation. This is at a cost of N3,164,293,880 plus N250,000 million for security and other logistics, a total of N3.4 billion and is awarded to SodoGuru Nigeria Limited with a completion period of three months.”

Aliyu revealed that $23.9 million was approved for the construction of power substations in Gaidam, Yobe state, and Zing in Taraba.

Also, he said the ministry got the approval for the construction of five multi million dollars one-line power substations in Birnin Kudu, Babura, and Kazaure in Jigawa state; Nguru, Yobe; Oro, in Kwara, and a 22-kilometer transmission line passing through Birnin Kudu-Missau-Ningi-Azare in Jigawa and Bauchi.

Speaking with journalists, Mu’azu Sambo, minister of transportation, said the ministry got approval for the four memos it presented.

The memos included N1.78 billion for the upgrade of a data center for the Nigerian Ports Authority (NPA).

“The first to be approved is in respect of the award of contract for the upgrade of the data center of the Nigerian Ports Authority, its servers, storage, and business continuity at the cost of N1,787, 203, 792.65 inclusive of 7.5 percent value-added tax with a completion period of six months, ” the minister said.

“The second memo that was approved was for a concession of the eastern zone offshore waste reception facility, in line with international conventions and environmental laws signed by Nigeria, which require that offshore wastes generated by ships be disposed of in an organized manner in order to protect biodiversity and human beings.”

Sambo said when completed, the project would generate $25 million within 20 years.

The minister said he obtained a similar approval for the Western and Central zones of the maritime domain of Nigeria, for 10 years.

According to Sambo, the Nigerian Maritime Administration and Safety Agency (NIMASA) got approval for the deployment of the modular floating dock acquired by the agency, to be managed under a public-private partnership.

“It is going to be managed by a private company that will put in an initial capital investment of $19.5 million for a concession period of 15 years,” he added.

However, the minister disclosed that when fully established and running, the facility will save Nigeria millions of foreign exchange, adding that the present situation warrants all cabotage vessels operating in Nigeria to go to Benin Republic and Ghana in order to access their docking services.

below content

Quality journalism costs money. Today, we’re asking that you support us to do more. Support our work by sending in your donations.

The donation can be made directly into NatureNews Account below

Guaranty Trust Bank, Nigeria

0609085876

NatureNews Online

Leave a comment

This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish. Accept Read More